Bowsprit, Centerboard, Rudder, & Trailer Bunk

Took a week off for spring skiing in Vail CO, but found time to work on a few items since loading Alice Gale onto the trailer.

I still have to construct a side guard bunk for the trailer but I finished an underhull bunk that will stabilize the boat during transport.

Stabilizing bunk, major weight on keel.

The bowsprit has a two eyed mastband that was fitted.

Getting the fit just right

Looking rather long with this wide angle view

Varnish work

Started work on the centerboard.  After fairing it will be primed and painted.

Steel Centerboard ready for fairing work

A pin will be added

Hoisting and safety rope holes

The rudder was also sanded and prepped for primer and paint.

A layer of fiberglass sheathing was laid down

Will be adding these Zebrawood Caps to the Centerboard Trunk

 